Road Design Project Undertaken by the Department
Curve Improvements along Main Road 601 and the Improvement of
Main Road 608/MR 601 Intersection undertaken by Russell Dally (Road Design)
Project History
The design was requested by the Road Safety Directorate for
the curve improvements along MR 601 near the MR 608 intersection, as well as
improving the existing intersection. The said corner comprised a tight broken
back curve with two sub-standard curves of minimum radii running into each
other. On the inside of the curve there was a vertical cut face of solid rock,
which severely limited the sight distance, particularly in the direction of
Franklin, which appears to be the direction in which the vehicles were
travelling when the accidents occurred. In order that the geometrics of the
curve were improved it was recommended that part of the carriageway be realigned
for a proper circular curve and in so doing pulling the edge of the road away
from the vertical rock face. This would improve the visibility around the curve.
In so doing part of the rock face had to be cut away in order to improve the
sight distance.
 |
 |
During Construction
Portion of Main Road 601 curve improvements Looking towards Franklin &
cutting of rock face |
After Construction
Portion of Main Road 601 curve improvements Looking towards Franklin |
The existing MR 608 intersection onto MR 601 was improved and
re-designed to make it perpendicular to MR 601. Due to the volume of traffic
along MR 608 it also warranted the incorporation of a right turn refuge to
accommodate vehicles turning right into MR 608.
 |
 |
During Construction
Main Road 608/601 Intersection
Looking towards Kokstad |
After Construction
Main Road 608/601 Intersection
Looking towards Kokstad |
 |
|
 |
 |
During Construction
Portion of Main Road 608 |
After Construction
Main Road 601 and 608 Intersection |
Extensive drainage design was also required along the full
length of the curve adjacent to the rock face to ensure adequate drainage. The
Type B2 access was modified to incorporate a left hand lane to the intersection.
Design and Investigation Work Undertaken
In order to undertake the design work necessary for this
project a number of site inspections were undertaken. In particular, drainage
requirements were investigated as well the best method of improving the curve.
The drainage was an integral part of the design as kerb and channelling,
concrete lined V-drains and pipe culverts had to be incorporated into the
design. Site inspections by Road Design assist in the designer getting a general
feel for the terrain. This project involved the following design work:
- Type B2 modified access;
- Horizontal alignment (undertaken by Errol Ritson);
- Vertical alignment;
- Super-elevation;
- Manual drawing of the provisional design;
- Drainage design;
- Road marking design and modifications;
- Expropriation limits and the preparation of the Notice
Plan;
- InXpress application and Computer Aided Design
Draughting of relevant detailed working drawings;
- Incorporation of a Bus Bay;
- Calculation of Cost Estimate.